Static Transfer Switch (STS)

With the Cx Monitor there are two ways to quickly measure STS switching.

  1. Connect the extra current channel (This is why the Cx has 5 CT's) and let the monitor capture data based on changes in current.
  2. Use the "Manual" trigger button in Live-View. This can give up to 2 Minutes of waveform captures making the task trivial.

 

When the task is given to see three phase input and output, the Cx Monitor has a solution for that.

The Time Sync function can sync units together (or to a NTP server) as close as 1 millisecond.

Giving the ability to synchronize data sets across multiple power monitors.

This time sync can be done wirelessly, connected though Ethernet or across the internet to a NTP server.

RxMS News

  • 08/24/2023: Intelligent Load Bank 1.1.16 Released
  • 04/07/2023: Live-View Version 2.22 Released.
  • 11/14/2022: Intelligent Load Bank 1.1.15 Released
  • 08/03/2022: U-View Version 2.21 Released.
  • 08/02/2022: Live-View Version 2.21 Released.
  • 04/09/2022: RxMS passed 35,000 site surveys.
  • 03/20/2022: U-View Version 2.19 Released.
  • 06/08/2021: Live-View Version 2.19 Released.
  • 08/12/2021: Multi-View Version 0.06 Beta Release.
  • 06/04/2021: Multi-View Version 0.04 Beta Release.
  • 04/09/2021: RxMS passed 34,000 site surveys.
  • 03/03/2021: Multi-View Version 0.03 Beta Release.

Related Products

  • 1